-
Step Ladder
-
Combination Ladder
-
Platform Step Ladder
-
Straight Ladder
-
Rolling Ladder
-
Extension Ladder
-
Step Stool Ladder
-
Multipurpose Ladders
-
Scaffolding
-
Scaffolding and Platform Accessories
-
Personnel Lifts
- Product
- Qty in Cart
- Quantity
- Price
- Subtotal
-
Topman
AED1,031.00AED1,378.00 .Twin ladder designed for the use of one or two personsSlip –Resistant feetHeavy guage steel hingesDouble–Rivet step construction1-2 Persons can use from both sidesAED1,031.00AED1,378.00 . -
Topman
AED87.00AED110.00 .The Topman Horizontal Brace is designed for use with the AMWS8 scaffolding system, providing essential lateral support and structural stability. With a length of 2.5 meters, this brace enhances the strength of the scaffold setup, ensuring safety and...AED87.00AED110.00 . -
Topman
AED6,760.00Installation not includedBoth built in ladder and 6 rung frames are provided depends on the customers requirementSafe working load per platform is 225 kgThe caster has dual breaking system and the body is chrome platedMulti-level work is possible at one...AED6,760.00 -
Topman
AED7,145.00Installation not includedBoth built in ladder and 6 rung frames are provided depends on the customers requirementSafe working load per platform is 225 kgThe caster has dual breaking system and the body is chrome platedMulti-level work is possible at one...AED7,145.00 -
Topman
AED1,715.00Installation not includedScaffolding doesn't comes with stabilizer as stabilizers are not required for scaffolding less than 5 MtrsSafe working load per platform is 225 kgThe caster has dual breaking system and the body is chrome platedMulti-level work...AED1,715.00 -
Topman
AED2,480.00Installation not includedScaffolding doesn't comes with stabilizer as stabilizers are not required for scaffolding less than 5 MtrsSafe working load per platform is 225 kgThe caster has dual breaking system and the body is chrome platedMulti-level work...AED2,480.00 -
Topman
AED4,230.00Installation not includedBoth built in ladder and 6 rung frames are provided depends on the customers requirementSafe working load per platform is 225 kgThe caster has dual breaking system and the body is chrome platedMulti-level work is possible at one...AED4,230.00 -
Topman
AED5,220.00Installation not includedBoth built in ladder and 6 rung frames are provided depends on the customers requirementSafe working load per platform is 225 kgThe caster has dual breaking system and the body is chrome platedMulti-level work is possible at one...AED5,220.00 -
Topman
AED6,305.00Installation not includedBoth built in ladder and 6 rung frames are provided depends on the customers requirementSafe working load per platform is 225 kgThe caster has dual breaking system and the body is chrome platedMulti-level work is possible at one...AED6,305.00 -
Topman
AED9,770.00Installation not includedSafe working load of 225/ platform level up to the maximum of 750 kgs per towerEasy walk from the base to the top levelProvided staircase with anti-slip step & handrailThe platform provided with a large trap door for easy access...AED9,770.00 -
Topman
AED11,450.00Installation not includedSafe working load of 225/ platform level up to the maximum of 750 kgs per towerEasy walk from the base to the top levelProvided staircase with anti-slip step & handrailThe platform provided with a large trap door for easy access...AED11,450.00 -
Topman
AED12,990.00Installation not includedSafe working load of 225/ platform level up to the maximum of 750 kgs per towerEasy walk from the base to the top levelProvided staircase with anti-slip step & handrailThe platform provided with a large trap door for easy access...AED12,990.00 -
Topman
AED14,110.00Installation not includedSafe working load of 225/ platform level up to the maximum of 750 kgs per towerEasy walk from the base to the top levelProvided staircase with anti-slip step & handrailThe platform provided with a large trap door for easy access...AED14,110.00 -
Topman
AED3,500.00Installation not includedScaffolding doesn't comes with stabilizer as stabilizers are not required for scaffolding less than 5 MtrsEasy walk from the base to the top levelProvided staircase with anti-slip step & handrailThe platform provided with a large...AED3,500.00 -
Topman
AED6,120.00Installation not includedSafe working load of 225/ platform level up to the maximum of 750 kgs per towerEasy walk from the base to the top levelProvided staircase with anti-slip step & handrailThe platform provided with a large trap door for easy access...AED6,120.00 -
Topman
AED8,090.00Installation not includedSafe working load of 225/ platform level up to the maximum of 750 kgs per towerEasy walk from the base to the top levelProvided staircase with anti-slip step & handrailThe platform provided with a large trap door for easy access...AED8,090.00 -
Topman
AED8,650.00Installation not includedBuilt in ladder allows easy access to the topSafe working load per platform is 225 kgThe caster has dual braking system and the body is chrome platedMulti-level work is possible at one timeStabilizers are advisable for 5mtr and...AED8,650.00 -
Topman
AED10,050.00Installation not includedBuilt in ladder allows easy access to the topSafe working load per platform is 225 kgThe caster has dual braking system and the body is chrome platedMulti-level work is possible at one timeStabilizers are advisable for 5mtr and...AED10,050.00 -
Topman
AED11,030.00Installation not includedBuilt in ladder allows easy access to the topSafe working load per platform is 225 kgThe caster has dual braking system and the body is chrome platedMulti-level work is possible at one timeStabilizers are advisable for 5mtr and...AED11,030.00 -
Topman
AED11,450.00Installation not includedBuilt in ladder allows easy access to the topSafe working load per platform is 225 kgThe caster has dual braking system and the body is chrome platedMulti-level work is possible at one timeStabilizers are advisable for 5mtr and...AED11,450.00